Snowmaking System Design & Master Planning
SMI works with your team to understand your snowmaking challenges and plan improvements around your mountain’s goals and budget. We help address water limitations, aging infrastructure, steep terrain, and marginal operating conditions.
Drawing on experience with more than 500 resorts, we combine your team’s knowledge of the mountain with our equipment and system-design experience to develop practical plans for immediate improvements and future expansion.
SMI Snowmakers’ Master Planning Includes
-
Review of Your Existing System
SMI Snowmakers' master planning team will review your existing snowmaking system, including equipment, pumping, electrical systems, climate, and terrain.
-
Finding Problems
After our review of your snowmaking system, we will give you a detailed report on any capacity issues, equipment & production limitations, and anything else that may be causing problems.
-
Establishing Goals & Requirements
SMI will then define coverage goals, production targets, priority terrain, and how much of each resource (water/energy) is needed to hit these goals. We will work closely with your team to define your resort’s snowmaking goals.
-
Develop Layouts
SMI will provide electrical, piping, pumping, and equipment layouts for your entire snowmaking system project. Please review different levels of master planning and what each includes below.
-
Phased Planning
SMI excels at long-term, phased master planning for snowmaking systems. Working closely with your team, we can develop project phases to help your resort reach its long-term goals.
Master Planning Levels
-
Focused Project Planning
For a trail expansion, equipment upgrade, or specific system improvement.
Planning may include:
Snowmaker placement and coverage layouts.
Preliminary pipe and cable sizing.
Water and air demand calculations.
Equipment recommendations.
Conceptual drawings and a project budget range.
-
Phased System Planning
For existing systems that need coordinated improvements over several project phases.
Planning may include:
Review of system performance and limitations.
Phased equipment and coverage plans.
Pumping, air, electrical, and pipeline layouts.
Automation recommendations.
Phase-based budgets and CAD drawings.
-
Full-Mountain Master Planning
For new development, major expansion, or full-system modernization.
Planning may include:
A full-mountain snowmaking plan.
Mapping and site coordination.
Detailed infrastructure engineering.
Phased capital budgets.
Bid-ready engineering packages.
Site visits and industry-partner coordination.
Start With Your Local SMI Team
Your local SMI team will work with you to define the planning scope and deliverables for your project and coordinate the next steps.